New energy / Battery
Battery module assembly line — 96 m pallet loop
Double-speed chain pallet loop with 14 lift-locate stations, RFID gates and a mezzanine return using a vertical lift.
- 96 m loop
- ±0.1 mm locating
- 8-week build
Challenge
A tier-1 battery plant needed module and pack assembly on one line, with screwdriving torque data traced to every carrier and no floor space left for buffers between stations.
What BIFA supplied
A BFP double-speed chain loop with accumulating zones replaced the buffers: 14 lift-locate stations pin each pallet to ±0.1 mm, RFID gates write the torque data to the MES, and a BFV vertical lift returns empty carriers over the aisle.
Result
- Footprint cut by 18 % — accumulation replaced physical buffers
- Traceability down to carrier level, accepted at first audit
- Commissioned in 3 weeks on site after an 8-hour FAT